These first six "photos" are illustrations of our new facility.
|

This is the Floor Plan (red plan is 3rd floor)
|

These next 4 illustrations simulate a "Virtual" tour
|

The Interior of the Manufacturing area
|

Superintendants office & Production Planning.
|

Executive Offices and Board Room
|

4 collage summary of a good project example
|

Collage of 3150sq.ft. custom Isomax home.
|

3rd collage 4 photos w/captions
|

Final collage of 3150sq.ft. home.
|

Isomax "1-Step" monolithic foundation/footer/slab system.
|

2nd collage 4 photos of our 1-Step Footer Panels
|

Final collage of 1-Step Footers Panel photos.
|

We create a 3D model of your plan to design the wall panels
|

We inspect the "as-built" foundation and adjust the panels design if need be.
|

Isomax panels will be factory built & shipped to your site
|

Panels are sequence loaded to go up right out of the trailer
|

Isomax panels are quickly placed & bonded in location
|

Note limited bracing to hold corners aligned & plumb
|

Large panels align easily we bond them in alignment
|

Isomax panels are robust & don't have a blow-out issue.
|

Rick is filling the 1st tier Note equipment in the background
|

The front door frame panels are 1st of the next tier to go up
|

The Isomax wall panel system reduces construction time
|

We regularly make custom size panels for our projects
|

Our crew fills the final third tier of wall panels
|

Here's the finished Product ! Thanks for your interest !
|

These are Photos from our 3 bedroom addition project
|

Isomax Wall Panels are ideal for home improvements
|

Theses are the 19 Panels that were built for this job
|

This is a good example of a large Isomax Wall Panel
|

These first few panels were installed in the first hour
|

It takes about 5 minutes to install even a large panel
|

These are close-up views of the rebar installations
|

Here's a bird's eye view of the progressing work
|

The last two Isomax Corner Panels being installed.
|

We're installing the last lintle panel on this project.
|

Installing the alignment blocks We no longer use the blocks
|

The project really was erected in about 2½ hours total time!
|

After filling the panels we add "J" bolts to hold the top plate
|

We're ready for the trusses and the roof sheathing
|

The addition is so much more energy efficient the electric bills actually went down.
|